Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETNative River (Capenhurst)
Native River (Capenhurst) is a 57 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Capenhurst 275kV Substation. The connection agreement is held by Native River Ltd.
Connection details
- NESO project number
- PRO-001557
- Customer
- Native River Ltd
- Technology
- Energy Storage System
- Total capacity
- 57 MW
- Already connected
- 57 MW
- Connection site
- Capenhurst 275kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Capenhurst 275kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem