BATTERY STORAGE · NGET

Capenhurst 275KV Substation

Capenhurst 275KV Substation is a 100 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Capenhurst 275kV Substation. The connection agreement is held by Zenobe Capenhurst Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001349
Customer
Zenobe Capenhurst Limited
Technology
Energy Storage System
Total capacity
100 MW
Already connected
100 MW
Connection site
Capenhurst 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Capenhurst · Grid map

Other projects at Capenhurst 275kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem