Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Brook Farm BESS

Brook Farm BESS is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Bramford 132kV. The connection agreement is held by Care Power (Brook Farm) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002201
Customer
Care Power (Brook Farm) Limited
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Bramford 132kV
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Bramford Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem