Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETCowley
Cowley is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Cowley 400kV Substation. The connection agreement is held by Pivoted Power LLP.
Connection details
- NESO project number
- PRO-001015
- Customer
- Pivoted Power LLP
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Already connected
- 50 MW
- Connection site
- Cowley 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Cowley 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem