BATTERY STORAGE Β· NGET

Ratcliffe on Soar

Ratcliffe on Soar is a 225 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Ratcliffe-On-Soar 400kV Substation. The connection agreement is held by Uniper UK Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000050
Customer
Uniper UK Limited
Technology
Energy Storage System, OCGT (Open Cycle Gas Turbine)
Total capacity
225 MW
Already connected
225 MW
Connection site
Ratcliffe-On-Soar 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ratcliffe-On-Soar Β· Grid map

Other projects at Ratcliffe-On-Soar 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem