Care Wolverhampton BEGA

Care Wolverhampton BEGA is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Penn GSP. The connection agreement is held by Care Power (Wolverhampton) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-006837
Customer
Care Power (Wolverhampton) Limited
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Penn GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Penn GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem