BATTERY STORAGE Β· NGET

SSE Ferrybridge BESS

SSE Ferrybridge BESS is a 150 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Ferrybridge B 132kV Substation. The connection agreement is held by Sse Battery Salisbury Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001614
Customer
Sse Battery Salisbury Limited
Technology
Demand, Energy Storage System
Total capacity
150 MW
Already connected
150 MW
Connection site
Ferrybridge B 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ferrybridge B Β· Grid map

Other projects at Ferrybridge B 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem