πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Pillswood BESS Phase 2

Pillswood BESS Phase 2 is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Creyke Beck GSP. The connection agreement is held by Heit Pw2 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001906
Customer
Heit Pw2 Limited
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Creyke Beck GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Creyke Beck GSP Β· Grid map

Other projects at Creyke Beck GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem