πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

KXP Immingham

KXP Immingham is a 80 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Grimsby West 400/132 GSP. The connection agreement is held by Kxp Immingham Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-005115
Customer
Kxp Immingham Limited
Technology
Energy Storage System
Total capacity
80 MW
Already connected
80 MW
Connection site
Grimsby West 400/132 GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Grimsby West Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem