Whitegate Tertiary Connection

Whitegate Tertiary Connection is a 57 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Whitegate 275kV Substation. The connection agreement is held by HD144WHI LTD.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000512
Customer
HD144WHI LTD
Technology
Energy Storage System
Total capacity
57 MW
Already connected
57 MW
Connection site
Whitegate 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Whitegate · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem