Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Clay Tye Farm Phase 2

Clay Tye Farm Phase 2 is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Warley 132kV Substation. The connection agreement is held by Harmony CTF 2 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001854
Customer
Harmony CTF 2 Limited
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Warley 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Warley Β· Grid map

Other projects at Warley 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem