BATTERY STORAGE Β· NGETClay Tye Farm Phase 1
Clay Tye Farm Phase 1 is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Warley 132kV Substation. The connection agreement is held by Harmony Ctf Limited.
Connection details
- NESO project number
- PRO-001857
- Customer
- Harmony Ctf Limited
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Already connected
- 50 MW
- Connection site
- Warley 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Warley 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem