BATTERY STORAGE · NGET

Care Power Berkeley BEGA

Care Power Berkeley BEGA is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Severn Connection Node A 132kV Substation. The connection agreement is held by Care Power (Berkeley) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-006810
Customer
Care Power (Berkeley) Limited
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Severn Connection Node A 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Severn Connection Node A · Grid map

Other projects at Severn Connection Node A 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem