Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETCare Power Berkeley BEGA
Care Power Berkeley BEGA is a 50 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Severn Connection Node A 132kV Substation. The connection agreement is held by Care Power (Berkeley) Limited.
Connection details
- NESO project number
- PRO-006810
- Customer
- Care Power (Berkeley) Limited
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Already connected
- 50 MW
- Connection site
- Severn Connection Node A 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near Severn Connection Node A · Grid map
Other projects at Severn Connection Node A 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem