Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETBustleholme
Bustleholme is a 57 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Bustleholm GSP. The connection agreement is held by Pivoted Power LLP.
Connection details
- NESO project number
- PRO-001039
- Customer
- Pivoted Power LLP
- Technology
- Energy Storage System
- Total capacity
- 57 MW
- Already connected
- 57 MW
- Connection site
- Bustleholm GSP
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem