πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Enderby (Akira)

Enderby (Akira) is a 57 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Enderby 400kV Substation. The connection agreement is held by Enderby Battery Storage Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000426
Customer
Enderby Battery Storage Limited
Technology
Energy Storage System
Total capacity
57 MW
Already connected
57 MW
Connection site
Enderby 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Enderby Β· Grid map

Other projects at Enderby 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem