United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 32
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Stanislaus Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Navy 1 Geothermal |
75.0 MW | Withdrawn / abandoned |
| Valetudo 2 Energy Storage Battery storage |
75.0 MW | Withdrawn / abandoned |
| Butte Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Whale Rock Energy Battery storage |
75.0 MW | Withdrawn / abandoned |
| Borrego Starlight 1 Solar |
75.0 MW | Withdrawn / abandoned |
| Belridge Solar Energy Project Solar |
75.0 MW | Withdrawn / abandoned |
| Yermo Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Rio Seco Wind Onshore wind |
75.0 MW | Withdrawn / abandoned |
| Shovelnose Energy Storage Battery storage |
75.0 MW | Withdrawn / abandoned |
| Bradshaw Energy Storage Battery storage |
75.0 MW | Withdrawn / abandoned |
| Mimosa Solar Farm Solar |
75.0 MW | Withdrawn / abandoned |
| Mendota Solar I Solar |
75.0 MW | Withdrawn / abandoned |
| Tca Solar Goldtown Solar |
75.0 MW | Withdrawn / abandoned |
| Bobcat Energy Storage Battery storage |
75.0 MW | Withdrawn / abandoned |
| Ripon Generation Gas |
74.9 MW | Withdrawn / abandoned |
| Tierra Buena Energy Center Battery storage |
74.4 MW | Withdrawn / abandoned |
| Redwood House Wind Power Plant Onshore wind |
72.0 MW | Withdrawn / abandoned |
| Paniolo Solar Solar + storage |
72.0 MW | Withdrawn / abandoned |
| Rugged Solar Farm Solar |
71.9 MW | Withdrawn / abandoned |
| Wild West Solar Solar |
71.6 MW | Withdrawn / abandoned |
| Turon Energy Storage Battery storage |
71.5 MW | Withdrawn / abandoned |
| Curry Solar Solar |
71.5 MW | Withdrawn / abandoned |
| Warren Solar 1 Solar |
71.5 MW | Withdrawn / abandoned |
| Yermo Solar 1 Solar |
71.1 MW | Withdrawn / abandoned |
| Albacore ESS Battery storage |
70.9 MW | Withdrawn / abandoned |
| Bear River Wind Farm Q=117 Onshore wind |
70.0 MW | Withdrawn / abandoned |
| Solar Star Xi Solar |
70.0 MW | Withdrawn / abandoned |
| Coyote Canyon Geothermal |
70.0 MW | Withdrawn / abandoned |
| Sage Solar Farm Solar |
70.0 MW | Withdrawn / abandoned |
| Golden Hills Solar Farm Solar |
70.0 MW | Withdrawn / abandoned |
| Everlasting Battery storage |
70.0 MW | Withdrawn / abandoned |
| Mont du Soleil Solar + storage |
68.0 MW | Withdrawn / abandoned |
| Desert Obsidian Solar |
67.2 MW | Withdrawn / abandoned |
| Madera Energy Center Expansion Gas |
67.0 MW | Withdrawn / abandoned |
| Stockton Generation Expansion Gas |
67.0 MW | Withdrawn / abandoned |
| Walker Ridge Wind Energy Park Onshore wind |
66.2 MW | Withdrawn / abandoned |
| Mahogany Storage Battery storage |
66.0 MW | Withdrawn / abandoned |
| Oso Rojo West Solar |
65.8 MW | Withdrawn / abandoned |
| Sunshine Valley Solar 3 Solar |
65.0 MW | Withdrawn / abandoned |
| Montara Battery storage |
65.0 MW | Withdrawn / abandoned |
| Benicia Wind Onshore wind |
65.0 MW | Withdrawn / abandoned |
| Jupiter Bowl Battery storage |
64.4 MW | Withdrawn / abandoned |
| Nicolaus Storage Battery storage |
64.0 MW | Withdrawn / abandoned |
| Cinco Solar + storage |
63.7 MW | Withdrawn / abandoned |
| Desert Power Wind Project Onshore wind |
63.0 MW | Withdrawn / abandoned |
| Overlake Storage Battery storage |
62.6 MW | Withdrawn / abandoned |
| Excelsior Battery 1 Battery storage |
62.4 MW | Withdrawn / abandoned |
| Green Borders Geothermal Geothermal |
62.0 MW | Withdrawn / abandoned |
| Newton Battery storage |
61.9 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)