United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOTierra Buena Energy Center
Tierra Buena Energy Center is a 74.4 MW battery storage request withdrawn in the CAISO interconnection queue, in Sutter County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1466
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Pease 60kV
- Location
- Sutter County, California
- Technology
- Battery: 74.4 MW
- Total requested
- 74.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 16 April 2018
- Proposed online date
- September 2021
- Withdrawn
- April 2019
Location
Marker shows the centre of Sutter County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Sutter County
- Whiskey DiggingsSolar · 414 MW · in study
- Township Power BankBattery storage · 50.5 MW · in study
- Verbena Energy StorageBattery storage · 50.5 MW · in study
- Sutter Energy CenterGas · 600 MW · withdrawn
- Sutter Energy Center 2Gas · 600 MW · withdrawn
- Palermo Generating StationGas · 345 MW · withdrawn
- Rio Oso Generating StationGas · 325 MW · withdrawn
- Solar + storage project 2022-G1, Sutter CountySolar + storage · 300 MW · withdrawn
- Blue BirdSolar + storage · 232 MW · withdrawn
- Spindrift Hybrid SolarSolar + storage · 204 MW · withdrawn
- Spartan Energy StorageBattery storage · 152 MW · withdrawn
- Nicolaus StorageBattery storage · 64.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem