United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Spartan Energy Storage

Spartan Energy Storage is a 152 MW battery storage request withdrawn in the CAISO interconnection queue, in Sutter County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1704
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Rio Oso Substation 115kV
Location
Sutter County, California
Technology
Battery: 152 MW
Total requested
152 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
September 2023
Withdrawn
July 2020

Location

Marker shows the centre of Sutter County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Sutter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem