Solar + storage project 2022-G1, Sutter County

Solar + storage project 2022-G1, Sutter County is a 300 MW solar + storage request withdrawn in the West interconnection queue, in Sutter County, California, connecting to WAPA Sierra Nevada.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2022-G1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
O'Banion 230 kV Substation
Location
Sutter County, California
Technology
Solar: 300 MW Β· Battery
Total requested
300 MW
Service type
NRIS and ERIS
Study phase
Withdrawn by Customer via email on 3/1/23.
Queue status
Withdrawn
Entered queue
7 October 2022
Proposed online date
December 2025

Location

Marker shows the centre of Sutter County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Sutter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem