Spindrift Hybrid Solar

Spindrift Hybrid Solar is a 204 MW solar + storage request withdrawn in the CAISO interconnection queue, in Sutter County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedFeb 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1556
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Rio Oso Substation 115kV
Location
Sutter County, California
Technology
Solar: 102 MW · Battery: 102 MW
Total requested
204 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
November 2022
Withdrawn
February 2020

Location

Marker shows the centre of Sutter County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Sutter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem