πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί California

GAS Β· CAISO

Sutter Energy Center

Sutter Energy Center is a 600 MW gas request withdrawn in the CAISO interconnection queue, in Sutter County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedDec 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
379
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Table Mountain-Tesla 500kV line
Location
Sutter County, California
Technology
Gas: 600 MW
Total requested
600 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 May 2008
Proposed online date
January 2014
Withdrawn
December 2010

Location

Marker shows the centre of Sutter County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Sutter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem