Green Borders Geothermal

Green Borders Geothermal is a 62.0 MW geothermal request withdrawn in the CAISO interconnection queue, in Mineral County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2005 (completed)
  2. Withdrawn / abandonedOct 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
58
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Control 115kV Substation
Location
Mineral County, Nevada
Technology
Geothermal: 62.0 MW
Total requested
62.0 MW
Study phase
Executed
Queue status
Withdrawn
Entered queue
22 February 2005
Proposed online date
February 2012
Withdrawn
October 2013

Location

Marker shows the centre of Mineral County; the queue data does not give exact sites.