United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOSage Solar Farm
Sage Solar Farm is a 70.0 MW solar request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2011 (completed)
- Withdrawn / abandonedMay 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 762
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Contra Costa-Delta SW Yard 230kV
- Location
- Contra Costa County, California
- Technology
- Solar: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2011
- Proposed online date
- July 2014
- Withdrawn
- May 2013
Location
Marker shows the centre of Contra Costa County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Contra Costa County
- Steel City Battery StorageBattery storage Β· 675 MW Β· agreement signed
- Delilah Energy StorageBattery storage Β· 504 MW Β· agreement signed
- Allegheny Energy StorageBattery storage Β· 353 MW Β· agreement signed
- Black Diamond ES2Battery storage Β· 179 MW Β· agreement signed
- Harmony Storage 2Battery storage Β· 308 MW Β· in study
- Sherman Energy StorageBattery storage Β· 256 MW Β· in study
- Gateway Generating Facility (Fka Contra Costa Power Plant Project)Gas Β· 590 MW Β· built
- Black Diamond Energy StorageBattery storage Β· 200 MW Β· built
- Marsh Landing Generation Station - Simple Cycle UnitsGas Β· 100 MW Β· built
- Los Medanos Energy CenterGas Β· 72.0 MW Β· built
- Buena Vista RepowerOnshore wind Β· 37.5 MW Β· built
- Columbia Solar Energy 2 Fka Columbia Solar Energy IISolar Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem