Buena Vista Repower is a 37.5 MW onshore wind request built and operating in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusOperating
  1. PlanningQueued Oct 2003 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2006 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
21
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Windmaster/Buena Vista Sub
Location
Contra Costa County, California
Technology
Wind: 37.5 MW
Total requested
37.5 MW
Study phase
Executed
Queue status
Operational
Entered queue
23 October 2003
Proposed online date
July 2004
Came online
December 2006

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Contra Costa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem