United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Whale Rock Energy

Whale Rock Energy is a 75.0 MW battery storage request withdrawn in the CAISO interconnection queue, in San Luis Obispo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1749
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Caliente 230 kV
Location
San Luis Obispo County, California
Technology
Battery: 75.0 MW
Total requested
75.0 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
April 2031
Withdrawn
June 2025

Location

Marker shows the centre of San Luis Obispo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Luis Obispo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem