United States › Grid › Interconnection queues › California

WIND + STORAGE · CAISO

Islay

Islay is a 2,275 MW wind + storage request withdrawn in the CAISO interconnection queue, in San Luis Obispo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1998
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Diablo Canyon 500 kV
Location
San Luis Obispo County, California
Technology
Wind: 1,519 MW · Battery: 756 MW
Total requested
2,275 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
August 2034
Withdrawn
August 2025

Location

Marker shows the centre of San Luis Obispo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Luis Obispo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem