United States β€Ί Grid β€Ί Interconnection queues β€Ί California

GAS Β· CAISO

Ripon Generation

Ripon Generation is a 74.9 MW gas request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
37
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tesla Substation
Location
San Joaquin County, California
Technology
Gas: 74.9 MW
Total requested
74.9 MW
Study phase
Executed
Queue status
Withdrawn
Entered queue
8 November 2004
Proposed online date
December 2011

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem