Paniolo Solar

Paniolo Solar is a 72.0 MW solar + storage request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1483
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Jayne Switching Station 70kV
Location
Fresno County, California
Technology
Solar: 52.2 MW · Battery: 19.8 MW
Total requested
72.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2021
Withdrawn
March 2019

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.