United States β€Ί Grid β€Ί Interconnection queues β€Ί California

ONSHORE WIND Β· CAISO

Benicia Wind

Benicia Wind is a 65.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedFeb 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
956
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
VACA-VACAVILLE-JAMESON-NORTH TOWER 115KV
Location
Solano County, California
Technology
Wind: 65.0 MW
Total requested
65.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
December 2016
Withdrawn
February 2014

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Solano County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem