United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Corby 2

Corby 2 is a 476 MW battery storage request in interconnection study in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2031 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
1854
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Vaca-Dixon 230 kV
Location
Solano County, California
Technology
Battery: 476 MW
Total requested
476 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
March 2031

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Solano County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem