Rugged Solar Farm

Rugged Solar Farm is a 71.9 MW solar request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. ConsentedApr 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
789
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Boulevard East Substation 69 kV
Location
San Diego County, California
Technology
Solar: 71.9 MW
Total requested
71.9 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
31 March 2011
Agreement signed
23 April 2015
Proposed online date
April 2025
Withdrawn
March 2025

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Diego County