United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Butte Solar

Butte Solar is a 75.0 MW solar request withdrawn in the CAISO interconnection queue, in Butte County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedJun 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
801
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Butte-Table Mountain 115kV No. 2
Location
Butte County, California
Technology
Solar: 75.0 MW
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
February 2014
Withdrawn
June 2011

Location

Marker shows the centre of Butte County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Butte County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem