SOLAR Β· CAISOButte Solar
Butte Solar is a 75.0 MW solar request withdrawn in the CAISO interconnection queue, in Butte County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2011 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 801
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Butte-Table Mountain 115kV No. 2
- Location
- Butte County, California
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2011
- Proposed online date
- February 2014
- Withdrawn
- June 2011
Location
Marker shows the centre of Butte County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Butte County
- Solar + storage project 2019-G1, Butte CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project 2023-G4, Butte CountySolar + storage Β· 100 MW Β· in study
- Ameresco Butte County LandfillOther Β· 4.0 MW Β· built
- Bull RunSolar + storage Β· 457 MW Β· withdrawn
- Stageline Energy StorageBattery storage Β· 214 MW Β· withdrawn
- Bull Run 2 EsBattery storage Β· 205 MW Β· withdrawn
- Chickaree Hybrid SolarSolar + storage Β· 173 MW Β· withdrawn
- Trailways Energy StorageBattery storage Β· 102 MW Β· withdrawn
- Transfer Ridge WindOnshore wind Β· 60.0 MW Β· withdrawn
- Panem SolarSolar Β· 20.9 MW Β· withdrawn
- Meridian & Munjar Solar ProjectSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem