Transfer Ridge Wind

Transfer Ridge Wind is a 60.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in Butte County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedFeb 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
976
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
TABLE MTN-RIO OSO 230 KV Line
Location
Butte County, California
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
December 2016
Withdrawn
February 2014

Location

Marker shows the centre of Butte County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Butte County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem