United States › Grid › Interconnection queues › California

SOLAR + STORAGE · WEST

Solar + storage project 2023-G4, Butte County

Solar + storage project 2023-G4, Butte County is a 100 MW solar + storage request in interconnection study in the West interconnection queue, in Butte County, California, connecting to WAPA Sierra Nevada.

Queue statusIn planning
  1. PlanningQueued Aug 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2023-G4
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
Cottonwood-Roseville 230 kV Transmission Line
Location
Butte County, California
Technology
Solar: 100 MW · Battery
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
System Impact Study
Queue status
Active
Entered queue
22 August 2023
Proposed online date
March 2028

Location

Marker shows the centre of Butte County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Butte County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem