United States › Grid › Interconnection queues › California
OTHER · CAISOAmeresco Butte County Landfill
Ameresco Butte County Landfill is a 4.0 MW other request built and operating in the CAISO interconnection queue, in Butte County, California, connecting to PGAE.
Request details
- Queue ID
- 477
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Centerville-Table Mountain 60kV line
- Location
- Butte County, California
- Technology
- Other: 4.0 MW
- Total requested
- 4.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 6 February 2009
- Agreement signed
- 5 January 2011
- Proposed online date
- March 2010
- Came online
- May 2012
Location
Marker shows the centre of Butte County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Butte County
- Solar + storage project 2019-G1, Butte CountySolar + storage · 300 MW · in study
- Solar + storage project 2023-G4, Butte CountySolar + storage · 100 MW · in study
- Bull RunSolar + storage · 457 MW · withdrawn
- Stageline Energy StorageBattery storage · 214 MW · withdrawn
- Bull Run 2 EsBattery storage · 205 MW · withdrawn
- Chickaree Hybrid SolarSolar + storage · 173 MW · withdrawn
- Trailways Energy StorageBattery storage · 102 MW · withdrawn
- Butte SolarSolar · 75.0 MW · withdrawn
- Transfer Ridge WindOnshore wind · 60.0 MW · withdrawn
- Panem SolarSolar · 20.9 MW · withdrawn
- Meridian & Munjar Solar ProjectSolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem