United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOPanem Solar
Panem Solar is a 20.9 MW solar request withdrawn in the CAISO interconnection queue, in Butte County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2016 (completed)
- Withdrawn / abandonedJul 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1279
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Table Mtn.-Butte #2 115 kV Line
- Location
- Butte County, California
- Technology
- Solar: 20.9 MW
- Total requested
- 20.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 2 May 2016
- Proposed online date
- June 2019
- Withdrawn
- July 2016
Location
Marker shows the centre of Butte County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Butte County
- Solar + storage project 2019-G1, Butte CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project 2023-G4, Butte CountySolar + storage Β· 100 MW Β· in study
- Ameresco Butte County LandfillOther Β· 4.0 MW Β· built
- Bull RunSolar + storage Β· 457 MW Β· withdrawn
- Stageline Energy StorageBattery storage Β· 214 MW Β· withdrawn
- Bull Run 2 EsBattery storage Β· 205 MW Β· withdrawn
- Chickaree Hybrid SolarSolar + storage Β· 173 MW Β· withdrawn
- Trailways Energy StorageBattery storage Β· 102 MW Β· withdrawn
- Butte SolarSolar Β· 75.0 MW Β· withdrawn
- Transfer Ridge WindOnshore wind Β· 60.0 MW Β· withdrawn
- Meridian & Munjar Solar ProjectSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem