United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Desert Power Wind Project

Desert Power Wind Project is a 63.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
11
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Wheaton Substation
Location
San Bernardino County, California
Technology
Wind: 63.0 MW
Total requested
63.0 MW
Study phase
Executed
Queue status
Withdrawn
Entered queue
23 October 2002
Proposed online date
March 2008

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem