United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in the USA (2025 requests) โ page 24
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J4188, Beauregard Parish County Solar |
140 MW | In study |
| Solar project GEN-2024-157, Kiowa County Solar |
140 MW | In study |
| Battery storage project J4174, Poinsett County Battery storage |
140 MW | In study |
| Onshore wind project J3918, Champaign County Onshore wind |
138 MW | In study |
| Gas project ERAS-2025-035, Brown County Gas |
138 MW | In study |
| Gas project GEN-2024-286, Le Flore County Gas |
136 MW | In study |
| Pulaski Energy Storage Battery storage ยท Pulaski Energy Storage LLC |
135 MW | In study |
| Stonewall BESS Solar + storage ยท Stonewall ESS, LLC |
135 MW | In study |
| Gas project J3936, Kenosha County Gas |
132 MW | In study |
| Surplus; J1316 Gas |
132 MW | In study |
| Gas project 118, Polk County Gas |
132 MW | In study |
| Battery storage project GEN-2026-PR4, Hansford County Battery storage |
132 MW | In study |
| Solar project AG2-152, Pittsylvania County Solar ยท Virginia Electric and Power Company |
131 MW | In study |
| Maratua Solar Solar ยท BDPU Solar Maratua, LLC |
131 MW | In study |
| White Wing Storage Solar + storage ยท White Wing Solar, LLC |
130 MW | In study |
| Solar + storage project 773, Ada County Solar + storage |
130 MW | In study |
| Solar project GEN-2024-288, Cloud County Solar |
130 MW | In study |
| Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4 Battery storage |
130 MW | In study |
| Other project GEN-2025-SR13, Seminole County Other |
130 MW | In study |
| Nuclear project AH1-698, Will County Nuclear ยท Constellation Energy Generation, LLC |
130 MW | In study |
| Other project Q588, Pinal County Other |
130 MW | In study |
| Battery storage project S1112, Pike County Battery storage |
130 MW | In study |
| Solar + storage project J2818, Ouachita County Solar + storage |
130 MW | In study |
| Gas project 25-IC-1333B, Heard County Gas |
129 MW | In study |
| Gas project 25-IC-1333A, Heard County Gas |
129 MW | In study |
| Solar project J4059, Mcleod County Solar |
129 MW | In study |
| Lincoln Capital Land LLC Solar Project Solar ยท Lincoln Capital Land LLC |
128 MW | In study |
| San Gabriel Storage Solar + storage ยท San Gabriel Solar LLC |
128 MW | In study |
| White Wing Solar Solar + storage ยท White Wing Solar, LLC |
127 MW | In study |
| Solar project J4057, Mower County Solar |
127 MW | In study |
| Bunting Solar Project Solar ยท H4 Solar Project LLC |
126 MW | In study |
| Three Ranches Solar Solar + storage ยท Three Ranches Energy LLC |
126 MW | In study |
| Other project Q614, Maricopa County Other |
125 MW | In study |
| Solar project J2087, Renville County Solar |
125 MW | In study |
| Battery storage project LGE-CS2025-003, Crittenden County Battery storage |
125 MW | In study |
| Other project GEN-2025-SR15, Mcclain County Other |
125 MW | In study |
| Battery storage project GEN-2024-251, Eddy County Battery storage |
125 MW | In study |
| Gas project GEN-2024-334, Kay County Gas |
124 MW | In study |
| Battery storage project ERAS-2025-022, Pontotoc County Battery storage |
123 MW | In study |
| Great Hambino BESS Battery storage ยท Atascosa BESS, LLC |
123 MW | In study |
| Arnold Hills Storage Battery storage ยท Arnold Hills Storage, LLC |
123 MW | In study |
| Solar project 790, Washington County Solar |
122 MW | In study |
| Iron Cowboy Solar Solar + storage ยท Vaquero II Solar, LLC |
121 MW | In study |
| Wagyu BESS SLF Battery storage ยท Wagyu BESS, LLC |
121 MW | In study |
| Borden Dino Solar Solar + storage ยท Borden Dino Solar, LLC |
121 MW | In study |
| Neal Battery Solar + storage ยท CH Neal Battery LLC |
121 MW | In study |
| Dougherty County BESS Battery storage |
120 MW | In study |
| Solar project 282, Marion County Solar |
120 MW | In study |
| Sawmill Junction Solar |
120 MW | In study |
| Battery storage project J3930, Iberia Parish County Battery storage |
120 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)389 ยท 120.6 GW
- ERCOT (Texas)339 ยท 99.6 GW
- West (non-ISO utilities)324 ยท 84.1 GW
- SPP (Southwest Power Pool)268 ยท 71.3 GW
- Southeast (non-ISO utilities)258 ยท 41.7 GW
- PJM (Mid-Atlantic, Midwest)228 ยท 29.8 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)