Gas project ERAS-2025-035, Brown County

Gas project ERAS-2025-035, Brown County is a 138 MW gas request in interconnection study in the SPP interconnection queue, in Brown County, South Dakota, connecting to NWPS.

Queue statusIn planning
  1. PlanningQueued Oct 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
ERAS-2025-035
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NWPS
Connection point (POI)
Siebrecht 115 kV Substation
Location
Brown County, South Dakota
Technology
Gas: 138 MW
Total requested
138 MW
Service type
NRIS and ERIS
Study phase
ERAS
Queue status
Active
Entered queue
2 October 2025
Proposed online date
December 2029

Location

Marker shows the centre of Brown County; the queue data does not give exact sites.

Power plants in South Dakota · Transmission lines in South Dakota

Other requests in Brown County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem