United States › Grid › Interconnection queues › South Dakota
OTHER · WESTOther project GI-0314, Brown County
Other project GI-0314, Brown County is a 8.0 MW other request built and operating in the West interconnection queue, in Brown County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0314
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Aberdeen
- Location
- Brown County, South Dakota
- Technology
- Other: 8.0 MW
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 3 June 2003
- Proposed online date
- June 2006
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Brown County
- Solar + storage project GEN-2024-035, Brown CountySolar + storage · 270 MW · in study
- Gas project ERAS-2025-035, Brown CountyGas · 138 MW · in study
- Onshore wind project GI-1505, Brown CountyOnshore wind · 99.0 MW · in study
- Gas project 456, Brown CountyGas · 5.0 MW · in study
- Gas project GI-0316, Brown CountyGas · 110 MW · built
- Gas project GI-0608, Brown CountyGas · 106 MW · built
- Onshore wind project GI-0918, Brown CountyOnshore wind · 100 MW · built
- Gas project GI-1004, Brown CountyGas · 60.0 MW · built
- Onshore wind project J1989, Brown CountyOnshore wind · 250 MW · withdrawn
- Gas project GI-0820, Brown CountyGas · 120 MW · withdrawn
- Solar + storage project GEN-2023-084, Brown CountySolar + storage · 100 MW · withdrawn
- Onshore wind project GI-1214, Brown CountyOnshore wind · 99.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem