United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· WESTOnshore wind project GI-1214, Brown County
Onshore wind project GI-1214, Brown County is a 99.0 MW onshore wind request withdrawn in the West interconnection queue, in Brown County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1214
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Developer
- Day County Wind II
- Connection point (POI)
- Groton 115kV
- Location
- Brown County, South Dakota
- Technology
- Wind: 99.0 MW
- Total requested
- 99.0 MW
- Service type
- Other
- Study phase
- IAE/IAT
- Queue status
- Withdrawn
- Entered queue
- 9 October 2012
- Proposed online date
- December 2013
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Brown County
- Solar + storage project GEN-2024-035, Brown CountySolar + storage Β· 270 MW Β· in study
- Gas project ERAS-2025-035, Brown CountyGas Β· 138 MW Β· in study
- Onshore wind project GI-1505, Brown CountyOnshore wind Β· 99.0 MW Β· in study
- Gas project 456, Brown CountyGas Β· 5.0 MW Β· in study
- Gas project GI-0316, Brown CountyGas Β· 110 MW Β· built
- Gas project GI-0608, Brown CountyGas Β· 106 MW Β· built
- Onshore wind project GI-0918, Brown CountyOnshore wind Β· 100 MW Β· built
- Gas project GI-1004, Brown CountyGas Β· 60.0 MW Β· built
- Other project GI-0314, Brown CountyOther Β· 8.0 MW Β· built
- Onshore wind project J1989, Brown CountyOnshore wind Β· 250 MW Β· withdrawn
- Gas project GI-0820, Brown CountyGas Β· 120 MW Β· withdrawn
- Solar + storage project GEN-2023-084, Brown CountySolar + storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem