United States › Grid › Interconnection queues › South Dakota

ONSHORE WIND · WEST

Onshore wind project GI-1505, Brown County

Onshore wind project GI-1505, Brown County is a 99.0 MW onshore wind request in interconnection study in the West interconnection queue, in Brown County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusIn planning
  1. PlanningQueued Apr 2015 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-1505
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Groton 115kV
Location
Brown County, South Dakota
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Service type
Network resource (NRIS)
Study phase
IAP
Queue status
Active
Entered queue
8 April 2015

Location

Marker shows the centre of Brown County; the queue data does not give exact sites.

Power plants in South Dakota · Transmission lines in South Dakota

Other requests in Brown County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem