United States › Grid › Interconnection queues › Louisiana
BATTERY STORAGE · MISOBattery storage project J3930, Iberia Parish County
Battery storage project J3930, Iberia Parish County is a 120 MW battery storage request in interconnection study in the MISO interconnection queue, in Iberia Parish County, Louisiana, connecting to CLECO POWER.
- PlanningQueued Feb 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3930
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Morbihan
- Location
- Iberia Parish County, Louisiana
- Technology
- Battery: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 13 February 2025
- Proposed online date
- September 2029
Location
Marker shows the centre of Iberia Parish County; the queue data does not give exact sites.
Other requests in Iberia Parish County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem