United States › Grid › Interconnection queues › Louisiana
SOLAR + STORAGE · MISOSolar + storage project J1599, Iberia Parish County
Solar + storage project J1599, Iberia Parish County is a 100 MW solar + storage request in interconnection study in the MISO interconnection queue, in Iberia Parish County, Louisiana, connecting to CLECO POWER.
- PlanningQueued Jun 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J1599
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Morbihan - Hopkins 138kV
- Location
- Iberia Parish County, Louisiana
- Technology
- Solar: 100 MW · Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 23 June 2020
- Proposed online date
- September 2025
Location
Marker shows the centre of Iberia Parish County; the queue data does not give exact sites.
Other requests in Iberia Parish County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem