United States › Grid › Interconnection queues › Wisconsin

GAS · MISO

Surplus; J1316

Surplus; J1316 is a 132 MW gas request in interconnection study in the MISO interconnection queue, in Kenosha County, Wisconsin, connecting to METC.

Queue statusIn planning
  1. PlanningQueued Jan 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1090
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
EAST PARIS
Location
Kenosha County, Wisconsin
Technology
Gas: 132 MW · Battery
Total requested
132 MW
Queue status
Active
Entered queue
31 January 2025
Proposed online date
September 2026

Location

Marker shows the centre of Kenosha County; the queue data does not give exact sites.

Power plants in Wisconsin · Transmission lines in Wisconsin

Other requests in Kenosha County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem