United States › Grid › Interconnection queues › Florida

GAS · SOUTHEAST

Gas project 118, Polk County

Gas project 118, Polk County is a 132 MW gas request in interconnection study in the Southeast interconnection queue, in Polk County, Florida, connecting to Tampa Electric Company.

Queue statusIn planning
  1. PlanningQueued Apr 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
118
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tampa Electric Company
Connection point (POI)
Polk Substation, Polk County, Florida
Location
Polk County, Florida
Technology
Gas: 132 MW · Coal
Total requested
132 MW
Service type
Energy only (ERIS)
Study phase
2025 Cluster Study Underway
Queue status
Active
Entered queue
10 April 2025
Proposed online date
June 2026

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Florida · Transmission lines in Florida

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem