United States › Grid › Interconnection queues › Florida
BATTERY STORAGE · SOUTHEASTBattery storage project 120, Polk County
Battery storage project 120, Polk County is a 20.0 MW battery storage request in interconnection study in the Southeast interconnection queue, in Polk County, Florida, connecting to Tampa Electric Company.
- PlanningQueued May 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 120
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tampa Electric Company
- Connection point (POI)
- Pace Road Substation, Polk County, Florida
- Location
- Polk County, Florida
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- 2025 Cluster Study Underway
- Queue status
- Active
- Entered queue
- 5 May 2025
- Proposed online date
- January 2027
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Other requests in Polk County
- Gas project 333, Polk CountyGas · 84.0 MW · under construction
- Solar project 273, Polk CountySolar · 74.9 MW · under construction
- Solar project 76, Polk CountySolar · 55.0 MW · agreement signed
- Other project 70, Polk CountyOther · 48.0 MW · agreement signed
- Gas project 118, Polk CountyGas · 132 MW · in study
- Solar project 111, Polk CountySolar · 52.0 MW · in study
- Solar project 123, Polk CountySolar · 19.5 MW · in study
- Gas project 2, Polk CountyGas · 1,701 MW · built
- Gas project 2Gas · 701 MW · built
- Gas project 135, Polk CountyGas · 637 MW · built
- Gas project 1Gas · 567 MW · built
- Gas project 1, Polk CountyGas · 567 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem