United States › Grid › Interconnection queues › Florida

SOLAR · SOUTHEAST

Solar project 123, Polk County

Solar project 123, Polk County is a 19.5 MW solar request in interconnection study in the Southeast interconnection queue, in Polk County, Florida, connecting to Tampa Electric Company.

Queue statusIn planning
  1. PlanningQueued May 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
123
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tampa Electric Company
Connection point (POI)
Pebbledale Substation, Polk County, Florida
Location
Polk County, Florida
Technology
Solar: 19.5 MW
Total requested
19.5 MW
Service type
Network resource (NRIS)
Study phase
2025 Cluster Study Underway
Queue status
Active
Entered queue
6 May 2025
Proposed online date
December 2027

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Florida · Transmission lines in Florida

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem