United States › Grid › Interconnection queues › Oklahoma
OTHER · SPPOther project GEN-2025-SR15, Mcclain County
Other project GEN-2025-SR15, Mcclain County is a 125 MW other request in interconnection study in the SPP interconnection queue, in Mcclain County, Oklahoma, connecting to OG&E.
Queue statusIn planning
- PlanningQueued May 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2025-SR15
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OG&E
- Connection point (POI)
- McClain Substation
- Location
- Mcclain County, Oklahoma
- Technology
- Other: 125 MW
- Total requested
- 125 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 31 May 2025
- Proposed online date
- December 2029
Location
Marker shows the centre of Mcclain County; the queue data does not give exact sites.
Other requests in Mcclain County
- Gas project GEN-2024-013, Mcclain CountyGas · 496 MW · in study
- Battery storage project GEN-2024-187, Mcclain CountyBattery storage · 199 MW · in study
- Onshore wind project GEN-2017-153, Mcclain CountyOnshore wind · 253 MW · withdrawn
- Onshore wind project GEN-2017-152, Mcclain CountyOnshore wind · 252 MW · withdrawn
- Solar project GEN-2017-168, Mcclain CountySolar · 250 MW · withdrawn
- Battery storage project GEN-2017-169, Mcclain CountyBattery storage · 52.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem