United States › Grid › Interconnection queues › Oklahoma
BATTERY STORAGE · SPPBattery storage project ERAS-2025-022, Pontotoc County
Battery storage project ERAS-2025-022, Pontotoc County is a 123 MW battery storage request in interconnection study in the SPP interconnection queue, in Pontotoc County, Oklahoma, connecting to PEC.
Queue statusIn planning
- PlanningQueued Oct 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- ERAS-2025-022
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- PEC
- Connection point (POI)
- Monte Vista 138 kV Substation
- Location
- Pontotoc County, Oklahoma
- Technology
- Battery: 123 MW
- Total requested
- 123 MW
- Service type
- NRIS and ERIS
- Study phase
- ERAS
- Queue status
- Active
- Entered queue
- 1 October 2025
- Proposed online date
- June 2028
Location
Marker shows the centre of Pontotoc County; the queue data does not give exact sites.
Other requests in Pontotoc County
- Onshore wind project GEN-2016-102, Pontotoc CountyOnshore wind · 148 MW · agreement signed
- Solar project GEN-2021-091, Pontotoc CountySolar · 150 MW · withdrawn
- Onshore wind project GEN-2014-014, Pontotoc CountyOnshore wind · 150 MW · withdrawn
- Solar project GEN-2023-152, Pontotoc CountySolar · 140 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem